Serving every neighbourhood in Greater Sudbury

Free written estimates · +1 705-242-8237

Sudbury Epoxy Floors

Commercial And Industrial Epoxy Flooring In Sudbury, Ontario

Sudbury Epoxy Floors installs commercial epoxy flooring, industrial and warehouse epoxy flooring, polyaspartic systems and concrete floor coating for businesses across Greater Sudbury. Every floor we take on is fully insured. The slab is measured and moisture tested before it is priced, and the written quote names the system, the thickness, the line marking and the hours we work.

Call +1 705-242-8237.

  • Fixed written quotes
  • Diamond ground, never acid etched
  • Work phased around your production hours
  • Every job fully insured

Get Your Floor Priced

The building, the rough area and what crosses the floor. That is enough to get you booked in. Or call +1 705-242-8237.

Thanks — your request has been received. Someone from Sudbury Epoxy Floors will be in touch within one business day. For anything urgent, call +1 705-242-8237.

Photos of the slab help, especially if it is cracked or peeling.

Why Us

Why Choose Sudbury Epoxy Floors For Commercial Epoxy Flooring?

We specify commercial epoxy flooring against what actually crosses the floor. A forklift aisle, a wash-down bay, a mining supply shop and a retail showroom are four different floors, and the resin, the build thickness and the top coat change with each one. Our commercial epoxy flooring page sets out how we scope a building before quoting it.

The quote is built around your production hours, not ours. Most commercial epoxy flooring in this city goes down over a weekend, a shutdown week or a run of night shifts, in sections, so the building keeps running. The written scope says which bay is closed on which day and when you get it back.

Every job is fully insured, and the specification is written down before anyone arrives: surface preparation method, primer, base coat, thickness, top coat, line marking and cure times. A floor priced off a phone call is a floor with a second conversation coming once the grinder is running.

We work in Greater Sudbury only, so we already know the buildings. The slabs in the Donovan and the Flour Mill, the newer industrial pours out at Walden and Falconbridge, and what a pad sitting on blasted rock does differently from one on fill. Our about page covers how we approach a site visit.

What We Install

Commercial And Industrial Floors We Coat In Sudbury

Sixteen systems, each specified against what actually crosses the floor.

Loading dock levellers and bay doors above a coated grey dock apron in Greater Sudbury

Loading Dock and Ramp Coating

Loading dock and ramp coating is the heaviest epoxy flooring in the building, covering the apron inside the door, the leveller pit, the ramp and the approach, which together take more abuse than anywhere else. It is a heavy build with a textured finish, specified for grip in the wet.

View Loading Dock and Ramp Coating
Orange base coat being poured across a freshly prepared slab

Concrete Floor Coating

Concrete floor coating and epoxy flooring cover everything a bare slab can become: garage, basement, workshop, porch, mechanical room, shop floor or storage bay. Same principle every time, different system depending on what the floor has to survive.

View Concrete Floor Coating
Blue flake epoxy floor running the width of a three bay garage

Flake Epoxy Flooring

Flake epoxy flooring is the system most Sudbury garages and basements end up with. An epoxy base coat is rolled onto ground concrete, coloured vinyl chips are broadcast into it while it is wet, and a clear top coat locks everything down.

View Flake Epoxy Flooring
Grey flake floor across a finished basement home gym in Sudbury

Basement Floor Coating

Coating a basement slab takes a cold, dusty floor and makes it part of the house. The concrete gets sealed, the grey powder stops, and the surface will carry furniture, gym equipment and daily traffic.

View Basement Floor Coating
Benefits

What Are The Benefits Of Epoxy Flooring In A Working Building?

Epoxy flooring stops the slab absorbing brine, hydraulic oil, coolant and solvent, which is what ends most bare industrial floors in this climate.

Concrete dust stops. A bare slab sheds fine grey powder into stock, machinery and air handling all day, and a coated one does not.

Housekeeping gets faster and cheaper. Epoxy flooring is swept and auto-scrubbed rather than degreased, and it does not hold a stain the way open concrete does.

Light levels rise across a whole building. Warehouse epoxy flooring throws light back at the ceiling, which changes how the space reads without touching a single fixture.

Line marking, traffic aisles and hazard zones become part of the epoxy flooring instead of tape that lifts under a pallet truck.

Epoxy flooring gets grip where it needs it. Aggregate is added to wash-down areas, ramps and dock aprons, and left out where a scrubber has to run cleanly.

Not Sure Which System Your Building Needs?

Tell us what crosses the floor and we will tell you what belongs on it, including when the cheaper option is the right one.

Epoxy flooring information for Sudbury property owners

Warehouse Epoxy Flooring Wears Out In Places A Garage Floor Never Does

Industrial epoxy flooring wears in lines, not patches. The forklift aisle, the pivot point at the end of a rack run, the apron inside the dock door and the strip in front of a workbench take almost all of the damage, while the floor under the racking stays untouched for twenty years.

That pattern decides the epoxy flooring specification. There is no sense coating a whole plant to the same build when a quarter of it is doing the work, so we thicken the aisles and the turning circles, and use a harder top coat where the traffic actually is. Our industrial and warehouse flooring page goes through how those zones get mapped before a quote.

Sudbury's Mining Supply Shops Have The Hardest Epoxy Flooring In The City

The fabrication shops, machine shops and equipment yards that serve the mines around Greater Sudbury put more through epoxy flooring than almost any other building type here. Steel gets dragged across it. Parts get dropped on it. Hydraulic oil and cutting fluid land on it daily, and the wash bay runs year round.

Epoxy flooring in a shop like that is a thickness and chemistry question rather than a colour one. We build a heavier system, specify a top coat that shrugs off oil and solvent, and put a textured finish anywhere the floor gets wet. Where a floor has already been eaten through, the epoxy floor repair and recoating page explains what can be saved and what has to come off.

Winter Sand Wears Commercial Epoxy Flooring Faster Than Salt Does

Greater Sudbury puts down a great deal of winter sand, and every vehicle that enters your building brings it in. Salt is a chemical problem that a sealed floor already solves. Sand is a mechanical one.

Grit trapped under a forklift wheel or a pallet truck castor works like sandpaper on every turn, and it wears thin epoxy flooring through at the aisles and the dock apron long before anything else fails. This is why the cheap quote does not survive here. A single thin layer has almost no material to give up.

We build thickness and finish with an abrasion-resistant top coat, because in this city the top coat does more work than the colour underneath it.

Commercial Epoxy Flooring Is Priced On Downtime As Much As Square Footage

The number that matters to a business is not what epoxy flooring costs per square foot, it is how many hours the building is out of use. That is why we lead with polyaspartic over standard epoxy flooring on most commercial work.

A polyaspartic system keeps curing in the cold and returns a floor to foot traffic in hours and to vehicles inside a day, where a straight epoxy build wants days. On a live warehouse that difference is worth more than the difference in material price. The polyaspartic floor coating page sets out the cure times we work to.

We also phase the work. Half a warehouse at a time, one bay per night, or a full shutdown week if you have one scheduled. The program goes in the written scope so nobody is guessing on the Monday.

Line Marking Belongs Inside The Epoxy Flooring, Not On Top Of It

Aisle lines, walkway edges, hazard hatching and bay numbers are installed between epoxy flooring coats so they finish flush and sit under the clear top coat. Painted lines on top of a finished floor get picked up by pallet truck wheels within a season, and taped lines last less time than that.

Marking out is worth doing at the same time as the epoxy flooring because the building is already empty. We set the layout out with you on site, against how the racking and the traffic actually run rather than how the drawing says they do.

Wash-Down And Food Areas Need A Different Resin From Standard Epoxy Flooring

Not every commercial floor should take standard epoxy flooring. A commercial kitchen, a food processing room or a bottling area that sees hot water, steam cleaning and organic acids wants a urethane-based system with a coved base at the wall, not a standard epoxy build.

The same is true of a battery charging bay, a chemical store or a containment bund, where the question is what the floor has to resist rather than what it has to look like. We say plainly when a job needs one of those systems, and equally plainly when a straightforward concrete floor coating is all the room actually needs.

Office And Retail Epoxy Flooring Is Judged By Eye

Customer-facing epoxy flooring has a different job. Epoxy flooring here has to look considered, take shopping carts, stools and heels, and clean up quickly, and it is usually laid in a space with glass and good lighting where every defect shows.

Ground and polished concrete effects, metallic finishes and flat solid colours all suit that setting, and the metallic epoxy flooring page shows what the decorative systems can do. The preparation underneath is exactly the same as an industrial floor, which is the part nobody sees and the part that decides whether it lasts.

Moisture Rises Through Slabs On Bedrock And Lifts Epoxy Flooring

Greater Sudbury sits in the Sudbury Basin and a great deal of this city is built directly on rock, which changes how epoxy flooring has to be specified. Basements and building pads are blasted out, and slabs often sit on shallow fill over ledge.

Rock does not drain the way deep soil does, so water gets held against the underside of a slab and moves up through the concrete. A coating over a slab that is pushing moisture lifts in sheets, whatever the resin cost. That is why every quote we write follows a moisture reading, and why we occasionally tell a building owner not to coat a floor yet.

Rock also cracks a slab in predictable places, usually where the pour crosses from ledge onto fill. Those cracks get chased out and filled properly rather than skimmed, because a crack that moves will telegraph straight back through a new floor.

Can Epoxy Flooring Go Down Through A Sudbury Winter?

Usually yes, and the answer depends on the slab rather than the calendar. From November to March this city often stays below freezing all day, with January averaging about minus thirteen.

Standard epoxy flooring thickens below roughly ten degrees and can stop curing altogether, so it is the wrong choice for an unheated building in February. Polyaspartic tolerates far colder application and keeps building strength where epoxy stalls, which is why it is our default here rather than an upsell.

We take the temperature of the slab, not the air, and heat the space when the numbers call for it before any epoxy flooring goes down. If conditions will not allow a floor that lasts, we book the work for a warmer window instead of taking the deposit.

Failed Epoxy Flooring Almost Always Failed At The Preparation Stage

Nearly every epoxy flooring failure we are called in to replace comes down to what happened before the resin went down. Acid etching instead of diamond grinding leaves concrete that a coating cannot key into. Coating over an unmeasured slab that is pushing moisture guarantees a lift. Coating over an old, failing layer means the new floor fails exactly where the old one did.

All of it is recoverable. It means grinding the old floor back to sound concrete and starting properly, and we do that regularly in buildings that bought on price the first time.

What Does Commercial Epoxy Flooring Cost In Sudbury?

Most commercial epoxy flooring and industrial coating systems in Canada fall somewhere between five and twelve dollars a square foot installed, covering preparation, materials and labour. Heavy-duty urethane systems for kitchens, wash-down and food areas run higher, commonly in the ten to twenty dollar range, because the material and the coved detailing cost more.

Larger epoxy flooring jobs price better per square foot, since grinding equipment, mobilization and setup cost much the same whether the area is small or large. Most contractors carry a job minimum somewhere around two thousand to twenty-five hundred dollars for that reason.

Those are market ranges rather than a quote. Slab condition, the amount of old coating to remove, the line marking and the hours we are allowed to work move the number more than area does. We measure, test and give you one fixed written price.

Garage, Basement And Outdoor Epoxy Flooring Is Still Part Of The Work

We still install residential epoxy flooring across Greater Sudbury, and it remains a real part of the work. A garage floor coating in flake with a polyaspartic top coat handles sand, brine and hot tires. A basement floor coating seals the slab and kills the dust in a room built on rock.

Outdoor steps, porches and pool surrounds take a different top coat again, one that will not yellow in sun or turn slick when wet, which the patio and outdoor concrete coating page covers.

How Other Epoxy Flooring Crews Handle Canadian Winters

Sudbury's long, stable deep freeze is only one version of what a coating has to survive across the country, and it helps to see how crews elsewhere plan around their own local conditions. epoxy flooring in Welland deals with a milder, wetter climate and a very different moisture profile. garage floor coating contractors in Woodstock work a repeated freeze-thaw pattern instead of one long stable freeze. Airdrie concrete floor coating specialists face an entirely different prairie winter out west. epoxy floor coating services in Caledon plan around an escarpment climate with its own local wrinkles. Every one of these climates asks a slightly different question of the same coating.

Our Process

What Happens During A Commercial Epoxy Flooring Installation?

  1. We walk the building with you first, take moisture readings, map the traffic zones and agree which areas close on which days for the epoxy flooring work. The written scope and the program come out of that visit.

  2. The area is cleared and the slab is diamond ground back to sound concrete before any epoxy flooring goes down. Old coatings, curing compounds and laitance all come off, and this is the part of the job that decides how long the floor lasts.

  3. Repairs follow. Cracks are chased out and filled, spalled patches and dock aprons are rebuilt, and low spots holding water are levelled.

  4. The system goes down in coats, with line marking, hazard zones and any aggregate installed between them so everything finishes under the clear top coat.

  5. We hand the area back with written cure times and cleaning instructions, and move to the next section on the agreed date.

Service Area

Serving Businesses Across Greater Sudbury With Commercial Epoxy Flooring

We cover the whole amalgamated city. New Sudbury, Minnow Lake, the Donovan, the Flour Mill, Lockerby, the South End and the West End.

Out through Copper Cliff, Lively, Walden and Whitefish to the west, and Garson, Coniston, Falconbridge and Skead to the east.

North through Val Caron, Hanmer, Val Thérèse and Blezard Valley up the Valley, and across to Chelmsford, Azilda, Dowling and Onaping.

If your building is inside the City of Greater Sudbury, we cover it for commercial epoxy flooring. Call +1 705-242-8237 for a free written estimate, or use the contact page and we will arrange a site visit.

Get Your Sudbury Commercial Floor Quoted

One site visit, one moisture reading, one fixed written price, and a program that works around your hours. Call +1 705-242-8237.

Answers

Frequently Asked Questions

Less time than most people expect, because we plan the epoxy flooring around your hours rather than ours. A polyaspartic system takes foot traffic within hours and vehicles inside a day, so a weekend or a run of night shifts covers most warehouse and shop floors. Larger buildings are done in sections, and the written scope says which area closes on which day and when you get it back.

Yes, and most of our commercial epoxy flooring is installed that way. Tell us when the building is quiet and we will build the program around it. If you already have a shutdown week scheduled, that is usually the cheapest and least disruptive time to do a whole floor at once.

Yes. Aisle lines, walkway edges, hazard hatching and bay numbers go in between epoxy flooring coats so they finish flush and sit protected under the clear top coat, rather than being painted or taped on afterwards where pallet traffic lifts them. We set the layout out on site against how the building actually runs.

Yes, but usually not with standard epoxy flooring. Hot water, steam cleaning and organic acids call for a urethane-based system with a coved base where the floor meets the wall. We will tell you at the visit which system the room needs and why, including when a less expensive build is the right answer.

Almost always. Peeling epoxy flooring nearly always traces back to preparation, either acid etching instead of grinding, coating over moisture nobody measured, or coating over an older failing layer. The remedy is to grind back to sound concrete, test the slab, and rebuild the system properly. We are called in to do exactly that regularly.

Free Estimate

Send Us The Details Of Your Floor

Give us the building, a rough area and how the floor gets used. We will book a visit and put a number in writing. If you would rather talk it through, call +1 705-242-8237. Prefer to talk it through? Call +1 705-242-8237.

Thanks — your request has been received. Someone from Sudbury Epoxy Floors will be in touch within one business day. For anything urgent, call +1 705-242-8237.

Fields marked are required. Fields marked * are required. Photos of the slab help. Send them once we reply.

Call Now Get a Free Quote